7.jpg

Pallara Rising Main

Completed 2018

Pallara’s flat landscape required the construction of a new Pump Station and Rising Main to service the new Residential and Commercial Subdivisions in the area. Given the rapid development of the area, the new infrastructure was required to be complete in a tight timeframe.

Project Scope/Highlights:

  • 1.5km of twin DN315 and DN180 PE Rising Main in Common Trench

  • Numerous reinforced cast in situ structures

  • Tunnel Boring under Learoyd Road

  • Bridge Crossing over Oxley Creek – DICL pipe slung from underside of existing bridge

  • Construction of 9m Deep Manhole over existing DN1200 Trunk Sewer

  • Live Connection to DN1200 Trunk Sewer including setting up Bypass Pumping

  • All works through industrial areas and along public thoroughfares

IMG_3421.PNG

TMR - Gin Gin Street Scape 

Completed 2020

Construction of Stormwater pipelines and structures for a Bellwether project for DTMR

Project Scope/Highlights:

  • Construction of Stormwater pipe and structures to DTMR Specification

  • Constructing civil works while maintaining traffic flow

  • Liaising with local businesses to minimise disruption to their businesses

6.jpg

Ellendale, Upper Kedron

Completed 2020

Construction of a large, modern new subdivision with rolling stages in a rapidly expanding area. Construction of new sewer and water infrastructure to service this large subdivision. Connections of the new infrastructure to Existing Council and Service Providers Assets.

Project Scope/Highlights:

  • 2.6km of DN315/250/180/125 Water Pipelines

  • Live Connections to existing QUU Water Assets

  • Working through residential areas and along public thoroughfares

  • 6km of DN250/DN160 Sewer Pipelines

  • Numerous cast in situ sewer structures

Live Connections to existing QUU Sewer Assets

13.jpg

Stocklands Kalina, Springfield

Completed 2019

Construction of a large, modern new subdivision in a rapidly expanding area. Construction of new sewer, stormwater and water infrastructure to service this large subdivision. Connections of the new infrastructure to Existing Council and Service Providers Assets.

Project Scope/Highlights:

  • 2.5km of DN250/DN160 PE Sewer Pipelines

  • Numerous cast in situ sewer structures

  • Live Connection to existing QUU Sewer Asset

  • 1.8km of DN375 to DN1800 Stormwater Pipelines

  • Numerous cast in situ stormwater structures

  • 2.6km of DN250/180/125 PE Water Pipelines

  • Live Connection to DN450 Asbestos Trunk Water Main including removal and disposal of Asbestos Pipe

Working through residential areas and along public thoroughfares

4.jpg

Stocklands Pallara

Completed 2018

Construction of a large, modern new subdivision with rolling stages in a rapidly expanding area. Construction of new sewer and water infrastructure to service this large subdivision. Connections of the new infrastructure to Existing Council and Service Providers Assets.

Project Scope/Highlights:

  • 3km of DN250/180/125 PE and DN300 DICL Water Pipelines

  • Live Connections to existing QUU Water Assets

  • Working through residential areas and along public thoroughfares

  • 3.4km of DN250/DN160 Sewer Pipelines

  • Numerous cast in situ sewer structures

  • Live Connections to existing QUU Sewer Assets

Photo 11-3-19, 2 17 00 pm.jpg

Coles Distribution Centre, Redbank 

Completed 2020

Construction of a large, state of the art Coles Distribution Centre in a rapidly expanding industrial area. Construction of new stormwater infrastructure to service this large project. Connections of the new infrastructure to Existing Council Assets.

Project Scope/Highlights:

  • 1.5km of Stormwater Pipelines varying in size from DN300 to DN1500

  • Numerous cast in situ reinforced stormwater structures

  • Installation of 8m deep Gross Pollutant Trap